![]() So to move a 130,000+ lbs, five-axle mobile crane through the busy streets of Manhattan is a challenge. New York City has some of the most challenging restrictions on moving heavy. The GMK5250L’s easy mobility, fast setup and breakdown allows the contractor to perform picks where two cranes of the same size would be typically used.The crane has been busy since delivery with its 230 ft main boom making it a perfect choice for work on buildings over 20 stories without the need for a jib extension.Fast setup and easy mobility of Grove GMK5250L allows 24/7 Lifting to work round the clock in the city that never sleeps, completing jobs both night and day.